 鲜花( 1)  鸡蛋( 0)
|
Procedures for building Garage
1.Concrete Foundation:
0 f, ]7 U, |% K* Y% Ua.land Flating: Need roller and pressor and get earth compaction index to civil technical requirement
0 g) E t% F. H& `( T; G+ J% ?8 ~b.Footings: need about 16"x8"footing reinforced with 3-15M steel Rebar continuously and 15M transverse rebar at 12" spacing+ c1 u$ R/ Y" @8 B. w$ b
c. Concrete wall: about 8" wide by 36" heigh reinfored with 15M vertical rebar at 12" spacing and 3-15M horizontal rebar , s4 k5 U; L0 X# c% j
d. Slab: about 5"-6" slab reinforced with 10M rebar at 12" spacing each way3 t; t0 `+ X6 u6 f
e. order concrete mix from Lafarge or Inland concrete ready mix
, [- H: Q S. e9 a$ K' Bf.pour concrete first footing, wall and last slab.
, e% Y" d1 v5 B6 q) X+ H# M1 U8 i' R7 X# f0 Z$ ]1 {
After 3days later (better 7days) you can start framing with wood and dry wall, and insulatin materials1 c9 \3 L% U/ ?( ~
5 {% b" O. q. |3 mAll of them you need have roughly design and sketch. Estimate materials. |
|