一共就两次walk through,第一次就说了railing有问题, 然后就是最后一次walk through,发现完全没看图纸 ... # B d. o. m* u
Did you ever follow up with the builder?, U- a, p; t' E' l, F8 J: v
I would tell the site superintendent to arrange another walk through once the problem is fixed but not drag it along until the final walk through.3 L, D- x1 s" _! Q- P
It is too late to talk about this now.
) J& C9 Z4 A' ]9 E0 BIf you have everything documented, show it to the lawyer and ask for hold back.
/ X- e# r, |/ ]. D Z M0 C' \
& m3 w j- @, |, pIf you can live with the wall, ask the builder to compensate you instead of removing the wall.
6 s1 f+ G% P5 ?9 }9 IIt will be messy after you move in and they come back to take down the wall. |
|