一共就两次walk through,第一次就说了railing有问题, 然后就是最后一次walk through,发现完全没看图纸 ...
3 ~) f& k- q9 a0 uDid you ever follow up with the builder?" \ z0 U, n6 {, M
I would tell the site superintendent to arrange another walk through once the problem is fixed but not drag it along until the final walk through.
s! E" {% v) `0 H% l% }1 WIt is too late to talk about this now. 5 F# O+ ], Z2 X( e
If you have everything documented, show it to the lawyer and ask for hold back.; K: r2 L- p: k0 v7 p6 l' T8 g8 p
* z" y# i) j7 Z. m5 z9 }; M
If you can live with the wall, ask the builder to compensate you instead of removing the wall.