米乐 发表于 2014-6-24 22:12 
, L/ b/ ^8 t' Z4 \: U% ~一共就两次walk through,第一次就说了railing有问题, 然后就是最后一次walk through,发现完全没看图纸 ...
6 I0 ? N& `6 r. d. V5 hDid you ever follow up with the builder?9 Y7 \) v/ y& E( H7 N
I would tell the site superintendent to arrange another walk through once the problem is fixed but not drag it along until the final walk through.: c. L3 w7 b' v: s/ {
It is too late to talk about this now.
( Z0 w, T) Y, m% A: \% KIf you have everything documented, show it to the lawyer and ask for hold back.
. ~3 B6 N/ P" |. n: E h& S2 F. Z# a4 p; ], ]# k
If you can live with the wall, ask the builder to compensate you instead of removing the wall.
4 D7 \0 n& @! B% RIt will be messy after you move in and they come back to take down the wall. |
|