Did you ever follow up with the builder?
1 g Q+ z% R+ H8 `/ [+ WI would tell the site superintendent to arrange another walk through once the problem is fixed but not drag it along until the final walk through.
, j/ b/ `" |, {It is too late to talk about this now. + E( Q: n7 t2 n* B
If you have everything documented, show it to the lawyer and ask for hold back.- S0 X$ j5 H+ b3 s3 x8 M2 k
1 y" s5 m- k9 s& h3 J; U
If you can live with the wall, ask the builder to compensate you instead of removing the wall.
( Y9 O* i% F/ p6 r# C9 A* ]It will be messy after you move in and they come back to take down the wall. |
|