 鲜花( 30)  鸡蛋( 0)
|
本帖最后由 爱城一粒沙子 于 2015-7-29 16:33 编辑 K1 h# H6 R# x$ \9 A/ q+ a& m
" k; Z) g, Q6 f: H
Journeyman Electrician
1 ~6 {+ a) F8 q7 y- l% J: WTotal Number of Positions: 20 Positions Filled: 16 High Number: 103939 TRAVELER-2" _$ D4 z9 \. q6 v
Contractor: Norcan Electric$ L$ R+ z' ^+ Q2 n p2 Z
Location: Syncrude Maintenace (Base Plant)
2 A0 X: Z$ s) k+ JDescription:, M9 O0 @/ a0 C6 x! C+ g
Day shift, Start ASAP, 1 Week plus, 4/10's (May change to 10/4), Report after callout, Orientation to be confirmed, Working under the Maintenance Agreement, No beards, Own transportation, Camp provided if no residents, Industrial rate.; Z% \- c, i4 l$ ?, z
Pre-Requisites / Conditions: Pre-Access D&A (Active RSAP Site), CSTS, Heavy Lifting, Bending, Pulling, Climbing, Working at Heights, Must Have 2 Way Radio Communication Experience, Confined Space/Fall Protection/Mask Fit/H2S Alive/ First Aid/AWP & EHT Experience Preferred.
U& F! M7 y. |' [' r6 {+ vOpen Date: 07/22/2015$ C0 B4 B1 a" S1 o5 z" M
Close Date: 08/31/2015, g; \8 Z. \5 M
Job #: 441 |
|