 鲜花( 3)  鸡蛋( 0)
|
米乐 发表于 2014-6-24 22:12 
" x& v8 Y: n" C2 [" q G, n; R6 n一共就两次walk through,第一次就说了railing有问题, 然后就是最后一次walk through,发现完全没看图纸 ... : v9 k# Q" u, E, [* ]/ q
Did you ever follow up with the builder?" b m- p8 U# a2 @0 }2 B1 M* y
I would tell the site superintendent to arrange another walk through once the problem is fixed but not drag it along until the final walk through.
6 [9 e" x9 f# C; XIt is too late to talk about this now. 5 a% S1 P% `' Z: M, O- I( R" Q
If you have everything documented, show it to the lawyer and ask for hold back.- p$ p, ?* E2 g# \
8 C) c6 ]& a6 P, p ~; L1 v( x
If you can live with the wall, ask the builder to compensate you instead of removing the wall.* u* x! i8 a/ l; F
It will be messy after you move in and they come back to take down the wall. |
|